"Metrado de Concreto por Mes" "" "" "Fecha de Vaceado" "Material: Name" "Material: Volume" "Count" "" "" "" "" "" "Concreto 350Kg/cm²" "4.996" "9" "" "Concreto 350Kg/cm² Shotcrete" "366.048" "7" "" "Concreto 350Kg/cm²" "81.236" "22" "/SEM1" "Concreto 350Kg/cm²" "60.486" "14" "/SEM3" "Concreto 350Kg/cm²" "1.825" "1" "0" "Concreto 350Kg/cm²" "3.425" "3" "01/11/2014" "Concreto 350Kg/cm²" "67.631" "23" "01/12/2014" "Concreto 350Kg/cm²" "16.713" "10" "02/01/2015" "Concreto 350Kg/cm²" "14.572" "14" "02/12/2014" "Concreto 350Kg/cm²" "57.510" "19" "03/10/2014" "Concreto 350Kg/cm²" "60.111" "10" "03/11/2014" "Concreto 350Kg/cm²" "35.941" "18" "05/10/2014" "Concreto 350Kg/cm²" "24.750" "9" "05/11/2014" "Concreto 350Kg/cm²" "104.020" "30" "06/11/2014" "Concreto 350Kg/cm²" "14.532" "6" "06/12/2014" "Concreto 350Kg/cm²" "87.555" "25" "07/10/2014" "Concreto 350Kg/cm²" "2.581" "3" "07/11/2014" "Concreto 350Kg/cm²" "25.307" "10" "07/12/2014" "Concreto 350Kg/cm²" "10.713" "4" "08/01/2015" "Concreto 350Kg/cm²" "12.072" "4" "08/10/2014" "Concreto 350Kg/cm²" "2.875" "4" "09/10/2014" "Concreto 350Kg/cm²" "29.645" "11" "09/12/2014" "Concreto 350Kg/cm²" "20.475" "7" "10/01/2014" "Concreto 350Kg/cm²" "2.500" "10" "10/10/2014" "Concreto 350Kg/cm²" "1.812" "3" "10/11/2014" "Concreto 350Kg/cm²" "42.128" "12" "11/01/2015" "Concreto 350Kg/cm²" "24.144" "8" "11/10/2014" "Concreto 350Kg/cm²" "17.402" "2" "11/11/2014" "Concreto 350Kg/cm²" "1.512" "2" "11/12/2014" "Concreto 350Kg/cm²" "11.700" "4" "12/10/2014" "Concreto 350Kg/cm²" "13.365" "4" "12/11/2014" "Concreto 350Kg/cm²" "53.426" "12" "12/12/2014" "Concreto 350Kg/cm²" "47.865" "12" "13/10/2014" "Concreto 350Kg/cm²" "42.581" "2" "13/11/2014" "Concreto 350Kg/cm²" "37.480" "9" "13/12/2014" "Concreto 350Kg/cm²" "8.775" "3" "14/10/2014" "Concreto 350Kg/cm²" "12.650" "4" "14/11/2014" "Concreto 350Kg/cm²" "46.786" "20" "14/12/2014" "Concreto 350Kg/cm²" "30.360" "7" "15/10/2014" "Concreto 350Kg/cm²" "159.015" "15" "16/10/2014" "Concreto 350Kg/cm²" "18.797" "6" "17/01/2015" "Concreto 350Kg/cm²" "8.775" "3" "17/10/2014" "Concreto 350Kg/cm²" "66.325" "56" "17/12/2014" "Concreto 350Kg/cm²" "46.173" "7" "18/10/2014" "Concreto 350Kg/cm²" "20.118" "8" "18/11/2014" "Concreto 350Kg/cm²" "123.110" "33" "19/10/2014" "Concreto 350Kg/cm²" "10.059" "6" "19/11/2014" "Concreto 350Kg/cm²" "35.778" "8" "20/10/2014" "Concreto 350Kg/cm²" "24.566" "7" "20/11/2014" "Concreto 350Kg/cm²" "23.168" "7" "20/12/2014" "Concreto 350Kg/cm²" "58.103" "20" "21/10/2014" "Concreto 350Kg/cm²" "32.489" "14" "21/11/2014" "Concreto 350Kg/cm²" "32.848" "11" "21/12/2014" "Concreto 350Kg/cm²" "12.072" "4" "22/10/2014" "Concreto 350Kg/cm²" "48.403" "8" "23/10/2014" "Concreto 350Kg/cm²" "17.394" "6" "23/11/2014" "Concreto 350Kg/cm²" "72.686" "24" "24/10/2014" "Concreto 350Kg/cm²" "46.623" "18" "25/11/2014" "Concreto 350Kg/cm²" "21.179" "6" "26/10/2014" "Concreto 350Kg/cm²" "27.289" "14" "26/11/2014" "Concreto 350Kg/cm²" "14.282" "6" "27/10/2014" "Concreto 350Kg/cm²" "22.259" "8" "27/12/2014" "Concreto 350Kg/cm²" "36.216" "12" "28/10/2014" "Concreto 350Kg/cm²" "21.551" "7" "28/11/2014" "Concreto 350Kg/cm²" "77.150" "40" "29/10/2014" "Concreto 350Kg/cm²" "22.275" "10" "29/11/2014" "Concreto 350Kg/cm²" "31.859" "11" "30/10/2014" "Concreto 350Kg/cm²" "19.583" "6" "30/11/2014" "Concreto 350Kg/cm²" "73.450" "26" "31/10/2014" "Concreto 350Kg/cm²" "8.305" "2"